Chat with us, powered by LiveChat

Valve, Oil Drain, 3/4-16 NPT

SKU
S7516
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

More Information
Weight 0.044000
Manufacturer SAF-AIR Products Inc
Similar Products
  1. Cable/Chain Kit
    CCKT206-08S
    Cable/Chain Kit
    Lead time 5–10 Days
  2. Pin /1
    MS16562-51
    Pin /1
    Lead time 5–10 Days
  3. Control, (Propeller)
    MC0311031-1
    Control, (Propeller)
    Lead time 5–10 Days
  4. Terminal (Eye)
    MS20667-4
    Terminal (Eye)
    Lead time 5–10 Days