Chat with us, powered by LiveChat

Valve, Fuel/Oil Drain, 1/2 NPT

SKU
CCB37000
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

More Information
Weight 0.009000
Manufacturer Curtis® Superior Valve Co, Inc
Similar Products
  1. Cable, Aileron
    MCNAS30624-1176
    Cable, Aileron
    Lead time 5–10 Days
  2. Tip, Rudder Butt
    SA-0431005-1
    Tip, Rudder Butt
    Lead time 5–10 Days
  3. Bolt /1
    AN176-17A
    Bolt /1
    Lead time 5–10 Days
  4. Roller (Seat Large)
    MCS1704-1
    Roller (Seat Large)
    Lead time 5–10 Days
  5. Receptacle
    CM300
    Receptacle
    Lead time 5–10 Days
  6. Bolt /1
    NAS6605D13.
    Bolt /1
    Lead time 5–10 Days