Chat with us, powered by LiveChat

Valve, Fuel Drain, 1/8 NPT

SKU
CCA1550
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

More Information
Weight 0.016000
Manufacturer Curtis® Superior Valve Co, Inc
Similar Products
  1. Breaker Point Kit
    10-357173
    Breaker Point Kit
    Lead time 5–10 Days
  2. Washer, Lock, 12 Mm
    EC72
    Washer, Lock, 12 Mm
    Lead time 5–10 Days
  3. Control, Universal, 12 Ft
    MCU124-144
    Control, Universal, 12 Ft
    Lead time 5–10 Days
  4. CherryMAX® Blind Rivet /100
    CR3213-4-02
    CherryMAX® Blind Rivet /100
    Lead time 5–10 Days
  5. Nut /50
    MS21083N3..
    Nut /50
    Lead time 5–10 Days
  6. Rivet /1
    NAS1738B4-2
    Rivet /1
    Lead time 5–10 Days