Chat with us, powered by LiveChat

Valve, Fuel Drain, 1/8-27 NPT

SKU
CAV-110
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

More Information
Weight 0.016000
Manufacturer SAF-AIR Products Inc
Similar Products
  1. Cable, Elevator Tab Up
    MCNAS31237-0323
    Cable, Elevator Tab Up
    Lead time 5–10 Days
  2. Cable (Elevator Trim Forward)
    MC0400107-8S
    Cable (Elevator Trim Forward)
    Lead time 5–10 Days
  3. Cable (Elevator Down Spring)
    MC1260505-31
    Cable (Elevator Down Spring)
    Lead time 5–10 Days
  4. CHT Probe
    P-100
    CHT Probe
    Lead time 5–10 Days
  5. Sunbeam Landing 24 V
    90-1000-24
    Sunbeam Landing 24 V
    Lead time 5–10 Days