Chat with us, powered by LiveChat

Valve, Fuel Drain, 1/8-27 NPT

SKU
CAV-110
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

More Information
Weight 0.016000
Manufacturer SAF-AIR Products Inc
Similar Products
  1. Back Plate
    074-30027
    Back Plate
    Lead time 5–10 Days
  2. Engine Baffle Kit, Bare, Black Seals
    C182-7476-PKGH-BRBK
    Engine Baffle Kit, Bare, Black Seals
    Lead time 5–10 Days
  3. Filter, Oil (1 Pack = 6 EA)
    AA48110-2-6PK
    Filter, Oil (1 Pack = 6 EA)
    Lead time 5–10 Days
  4. Cable/Chain Kit
    CCKT210-08SE
    Cable/Chain Kit
    Lead time 5–10 Days
  5. Retaining Ring
    485-193
    Retaining Ring
    Lead time 5–10 Days