Chat with us, powered by LiveChat

Tip, Stabilator, Left

SKU
GF169-620001-27
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

More Information
Weight 0.257640
Manufacturer Knots 2U, Ltd
Similar Products
  1. Washer /100, AN960-816
    NAS1149F0863P..
    Washer /100, AN960-816
    Lead time 5–10 Days
  2. Repair Kit, Piper Strut
    PSR-KT-18
    Repair Kit, Piper Strut
    Lead time 5–10 Days
  3. Shim (Torque Link)
    MCS1450-6B14-007
    Shim (Torque Link)
    Lead time 5–10 Days
  4. Cable (Flap)
    MC0510105-93
    Cable (Flap)
    Lead time 5–10 Days
  5. Cable (Rudder Control RH)
    MC0510105-66
    Cable (Rudder Control RH)
    Lead time 5–10 Days