Chat with us, powered by LiveChat

Terminal, Wire Rope, Swaging, Fork End

SKU
MS20667-3
TERMINAL (Fork)
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

Product Description

Terminal, Wire Rope, Swaging, Fork End

Stainless Steel

Dash Number
Cable
Diameter Nominal
Minimum
Breaking Strength
A
D
F
G
H
L
N
U
1/16"
480 lbs.
0.160"
0.190"
0.218"
0.093"
0.500"
1.572"
0.078"
0.344"
3/32"
920 lbs.
0.218"
0.190"
0.254"
0.108"
0.670"
1.945"
0.109"
0.438"
1/8"
2,000 lbs.
0.250"
0.190"
0.383"
0.195"
0.735"
2.352"
0.141"
0.547"
5/32"
2,800 lbs.
0.297"
0.250"
0.406"
0.202"
0.800"
2.655"
0.172"
0.688"
3/16"
4,200 lbs.
0.359"
0.313"
0.543"
0.260"
0.880"
3.071"
0.203"
0.781"
7/32"
5,600 lbs.
0.427"
0.313"
0.625"
0.296"
0.970"
3.440"
0.234"
0.906"
1/4"
7,000 lbs.
0.494"
0.375"
0.688"
0.313"
1.070"
3.806"
0.265"
0.969"
More Information
Weight 0.009525
Manufacturer Hardware
Similar Products
  1. Cylinder & Valve Assy
    658593A2
    Cylinder & Valve Assy
    Lead time 5–10 Days
  2. Heat Shield, Engine Mount
    AF1250918-2
    Heat Shield, Engine Mount
    Lead time 5–10 Days
  3. Fairing, Strut To Fuselage, RH
    34-01-01-RFS
    Fairing, Strut To Fuselage, RH
    Lead time 5–10 Days
  4. Baffle Assembly-#4 Cylinder
    AF0555202-1-BRBK
    Baffle Assembly-#4 Cylinder
    Lead time 5–10 Days
  5. Switch (Flap)
    S1661-1
    Switch (Flap)
    Lead time 5–10 Days
  6. Hose Clamp
    LW15592-5-05
    Hose Clamp
    Lead time 5–10 Days