Chat with us, powered by LiveChat

Tank, Header, Rear, PA-18

SKU
3169-2
TANK, Header, Rear, PA-18
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

Product Description

Direct replacement for original sheet metal tank

  • Heavy duty welded aluminum
  • Light weight
  • Eliminates cracking
  • FAA-PMA/STC
  • STC
More Information
Weight 0.357431
Manufacturer F. Atlee Dodge Aircr. Services
Similar Products
  1. Cable (Aileron)
    MC1260105-103
    Cable (Aileron)
    Lead time 5–10 Days
  2. Nut /50
    AN315-5R..
    Nut /50
    Lead time 5–10 Days
  3. Bearing
    452-719
    Bearing
    Lead time 5–10 Days
  4. Cable, Aileron Center LH
    MCNAS30424-0397
    Cable, Aileron Center LH
    Lead time 5–10 Days