Chat with us, powered by LiveChat

Strobe Power Supply, 14/28 V

SKU
01-0770062-05
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

More Information
Weight 0.771000
Manufacturer WHELEN® Aerospace Technologies
Similar Products
  1. Brake Assy
    ABI-30-60A
    Brake Assy
    Lead time 5–10 Days
  2. Cable (Elevator Trim Aft LH)
    MC0510105-87
    Cable (Elevator Trim Aft LH)
    Lead time 5–10 Days
  3. "Tip, Wing, RH, 6"""" Nav-Pad"
    SA-36739-55
    "Tip, Wing, RH, 6"""" Nav-Pad"
    Lead time 5–10 Days
  4. Switch (Temperature)
    50-364445-1
    Switch (Temperature)
    Lead time 5–10 Days
  5. O-Ring
    M83248-1-233
    O-Ring
    Lead time 5–10 Days