Chat with us, powered by LiveChat

Spark Plug - Massive Electrode

SKU
UREM38E
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

More Information
Weight 0.113000
Manufacturer Tempest Aero Group®
Similar Products
  1. Cable (Elevator Up)
    MC1260475-107
    Cable (Elevator Up)
    Lead time 5–10 Days
  2. Tip, Wing, Conical, RH
    GF0523565-30-791
    Tip, Wing, Conical, RH
    Lead time 5–10 Days
  3. O-Ring AS3209-016
    M83248/1-016
    O-Ring AS3209-016
    Lead time 5–10 Days
  4. Air Filter Element
    BA6108
    Air Filter Element
    Lead time 5–10 Days
  5. Shaft (Carburetor Heat Box)
    MC1752078-4
    Shaft (Carburetor Heat Box)
    Lead time 5–10 Days