Chat with us, powered by LiveChat

Shroud, 4.20 Od

SKU
6ADH
SHROUD, 4.20 OD
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

Product Description

Note: Repair/service part only for use on full STC kit P/N KIT #20.

Vacuum Pump Cooling Kit

P/Ns KIT #10KIT #11, and KIT #20

Increase the life of your vacuum pump!

  • Uses ram air to keep cooler air flowing around the pump housing for longer life
  • FAA-PMA/STC
  • Installation hardware included

Vacuum pump not included.

Component List for Vacuum Pump Cooling Kits
 
Qty
Part Number
Description
1
2CDHCooling Shroud (3.96" O.D.)
1
2CDH-1

Flange 1"

13-14"
2CDH-21" ID SCAT Aeroduct Ducting
2
2CDH-3Cable Ties
4
AN526-632R8Screws
4
AN365-632Nuts
4
AN960-6Washers
 
P/N KIT#11
1
4ADHCooling Shroud (3.96" O.D.)
1
2CDH-1Flange
17-18"
2CDH-21" ID SCAT Aeroduct Ducting
2
2CDH-3Cables Ties
4
AN526-632R8Screws
4
AN365-632Nuts
4
AN960-6Washers
 
1
6ADHCooling Shroud (4.20" O.D.)
1
6CDH-1Flange
17-18"
6CDH-21.25" ID SCAT Aeroduct Ducting
2
2CDHCable Ties
4
AN526-632R8Screws
4
AN365-632 Nuts
4
AN960-6 Washers
 
More Information
Weight 0.068492
Manufacturer McFarlane Aviation, Inc
Similar Products
  1. Cable (Flap Control Lower)
    MC0510105-105
    Cable (Flap Control Lower)
    Lead time 5–10 Days
  2. Seat Track Assy, LH Outboard
    MC2611060-3
    Seat Track Assy, LH Outboard
    Lead time 5–10 Days
  3. Elbow 90° (Steel) /1
    MS20822-8
    Elbow 90° (Steel) /1
    Lead time 5–10 Days
  4. Bolt /10
    AN5-7A
    Bolt /10
    Lead time 5–10 Days
  5. Cable (Elevator Aft Upper)
    MC0510105-393
    Cable (Elevator Aft Upper)
    Lead time 5–10 Days
  6. Fairing, Landing Gear Strut RH
    SA-0741052-200
    Fairing, Landing Gear Strut RH
    Lead time 5–10 Days