Chat with us, powered by LiveChat

Ring, Grease Seal, Flat

SKU
MC153-30013
RING, Grease Seal, Flat
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

Product Description

Wheel Grease Seals and Kits 

Finally a low cost alternative!

FAA-PMA approved for Cessna & Piper aircraft with Cleveland, and McCauley wheels.

  • Sold individually or as convenient kits
  • Each kit contains everything required to service one wheel: grease seal rings, plates, snap rings and felts; even screws and washers when required
  • We have done the research so you don’t have to!
  • Hard to find parts in stock
  • Save $$$

Future approvals will include Air Tractor, Beechcraft, Cirrus, Diamond, Mooney, and more!

  • Applicable for a wide range of aircraft
  • Direct replacement
  • Over 50% savings! 

Reference Documents:

              

Grease Seal Rings and Plates:
P/NIDODThicknessFig
MC153-003001-33/642-1/20.034A
MC153-004001-45/642-5/81/32A
153-005001-3/42-3/4*5/32B
MC153-008001-53/642-23/641/32A
MC153-010002-1/162-3/4*1/8B
MC153-015002-1/162-5/813/64C
MC153-300131-11/162-39/641/32A
153-300142-1/162-5/811/64C
MC153-300151-17/322-35/641/32A
MC156-001001-3/43-22/321/8D
*OD measurement does not include mounting tabs     
Grease Felt Seals:IDODThickness Snap Rings:IDODThickness
MC154-014001-3/42-5/81/8 MC155-001009/642-3/41/32
MC154-003001-5/82-5/81/8 MC155-002009/642-1/20.025
MC154-006001-3/42-13/32 1/8 MC155-118005/322-1/21/32
MC154-009002-1/82-7/161/8 MC155-119005/322-3/41/32
MC154-013002-1/82-1/23/16     
MC154-300102-1/82-17/321/8     
Dimensions are approximate and for identification only. Dimensions are in inches.

APS BlackSteel brake discs and linings, brake bleed valves, and wheel bearing cups and cones also available. 

More Information
Weight 0.014969
Manufacturer McFarlane Aviation, Inc
Similar Products
  1. Cable, Elevator Trim
    MCNAS30327-0587
    Cable, Elevator Trim
    Lead time 5–10 Days
  2. Piper Stab Cable Kit
    PCKT-STAB-08
    Piper Stab Cable Kit
    Lead time 5–10 Days
  3. Barrel (Brass)
    MS21251-B2L
    Barrel (Brass)
    Lead time 5–10 Days
  4. O-Ring
    MS29512-03
    O-Ring
    Lead time 5–10 Days