Chat with us, powered by LiveChat

Push Rod

SKU
652451
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

More Information
Weight 0.122000
Manufacturer Continental Aerospace Tech
Similar Products
  1. Valve Assembly, Fuel Selector
    MC0513120-8
    Valve Assembly, Fuel Selector
    Lead time 5–10 Days
  2. Repair Kit, Fuel Valve
    FSO-KT-16
    Repair Kit, Fuel Valve
    Lead time 5–10 Days
  3. Bolt (Wire Clamp)
    MCS2323-3
    Bolt (Wire Clamp)
    Lead time 5–10 Days
  4. Washer /100, AN960-516
    NAS1149F0563P.
    Washer /100, AN960-516
    Lead time 5–10 Days
  5. Control (Mixture)
    MCS191783-17
    Control (Mixture)
    Lead time 5–10 Days