Chat with us, powered by LiveChat

Nut

SKU
A1639-2
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

More Information
Weight 0.021000
Manufacturer McCAULEY - Textron, Inc
Similar Products
  1. Control (Throttle)
    S1222-13
    Control (Throttle)
    Lead time 5–10 Days
  2. Cable (Elevator Forward)
    MC0400107-166
    Cable (Elevator Forward)
    Lead time 5–10 Days
  3. Baffle Seal, LH Aft
    MC0509070-4
    Baffle Seal, LH Aft
    Lead time 5–10 Days
  4. Engine Baffle Kit, Bare, Black Seals
    C206-64715-PKGE-BRBK
    Engine Baffle Kit, Bare, Black Seals
    Lead time 5–10 Days