Chat with us, powered by LiveChat

Filter, Pneumatic (Garter)

SKU
ARB3-5-1
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

More Information
Weight 0.005000
Manufacturer Tempest Aero Group®
Similar Products
  1. Cable (Elevator Aft Upper)
    MC0510105-393
    Cable (Elevator Aft Upper)
    Lead time 5–10 Days
  2. Seat Rail, Inboard RH
    MC1711015-4
    Seat Rail, Inboard RH
    Lead time 5–10 Days
  3. Valve, Fuel Drain, 1/8 NPT
    CCA-36150
    Valve, Fuel Drain, 1/8 NPT
    Lead time 5–10 Days
  4. Bonding Strap, Assembly
    MC1570102-20
    Bonding Strap, Assembly
    Lead time 5–10 Days
  5. Camloc® Stud /1
    40S5-2S
    Camloc® Stud /1
    Lead time 5–10 Days