Chat with us, powered by LiveChat

Control (Throttle)

SKU
MC455-353
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

More Information
Weight 0.288031
Manufacturer McFarlane Aviation, Inc
Similar Products
  1. Engine Baffle Kit, Powder Coat, Black Seals
    C206-64715-PKGF-PCBK
    Engine Baffle Kit, Powder Coat, Black Seals
    Lead time 5–10 Days
  2. Cable/Chain Kit
    CCKT150-05S
    Cable/Chain Kit
    Lead time 5–10 Days
  3. Cable (Elevator Up)
    MC1260475-7
    Cable (Elevator Up)
    Lead time 5–10 Days
  4. Cable (Flap Direct RH)
    MC0510105-92
    Cable (Flap Direct RH)
    Lead time 5–10 Days
  5. Nut /50
    MS21044N4
    Nut /50
    Lead time 5–10 Days