Chat with us, powered by LiveChat

Control, Strainer Drain

SKU
MCS1517-4
CONTROL, Strainer Drain
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

Product Description

Fuel Strainer Drain Cables
MCS1517 Series

  • Stainless steel conduit
  • Improved aluminum knob
  • Larger wire diameter
More Information
Weight 0.183705
Manufacturer McFarlane Aviation, Inc
Similar Products
  1. 712-2DWK CHT/EGT Probe
    10-01225
    712-2DWK CHT/EGT Probe
    Lead time 5–10 Days
  2. Seal
    3022374
    Seal
    Lead time 5–10 Days
  3. Spring (Magneto)
    10-51324
    Spring (Magneto)
    Lead time 5–10 Days
  4. Engine Baffle Kit, Bare, Blue Seals
    C172IKL68-M73-BRBL
    Engine Baffle Kit, Bare, Blue Seals
    Lead time 5–10 Days