Chat with us, powered by LiveChat

Control, Strainer Drain

SKU
MCS1517-12
CONTROL, Strainer Drain
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

Product Description

Fuel Strainer Drain Cables
MCS1517 Series

  • Stainless steel conduit
  • Improved aluminum knob
  • Larger wire diameter
More Information
Weight 0.252288
Manufacturer McFarlane Aviation, Inc
Similar Products
  1. Spark Plug
    897255Z
    Spark Plug
    Lead time 5–10 Days
  2. Bolt /50
    AN3-6A
    Bolt /50
    Lead time 5–10 Days
  3. Brake Lining
    APS66-09000
    Brake Lining
    Lead time 5–10 Days
  4. Circuit Breaker
    W31X2M1G30
    Circuit Breaker
    Lead time 5–10 Days