Chat with us, powered by LiveChat

Control

SKU
MCS1239-46
CONTROL
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

Product Description

Cabin Environment Controls for Cessna Aircraft 

Longer life and improved design

McFarlane has FAA-PMA approval on the cabin air, cabin heat, cabin vent, cold air and defrost controls for many single engine Cessna aircraft. All of these controls feature McFarlane's improved push-to-unlock mechanism with greater holding strength and longer life. Most knobs match originally equipped knobs.

  • Special, heavier wire for more fatigue strength and reliability
  • Improved push-to-unlock mechanism on MCS P/Ns = more holding strength
  • Reduced vibration wear and longer life!
  • High temperature Teflon lined conduit

Cabin Environment Controls (cessna_cabincontrols.webp)

More Information
Weight 0.907185
Manufacturer McFarlane Aviation, Inc
Similar Products
  1. Washer
    78-A109
    Washer
    Lead time 5–10 Days
  2. Cable/Chain, Aileron Tab
    MC106-524031-1
    Cable/Chain, Aileron Tab
    Lead time 5–10 Days
  3. O-Ring
    M83248-1-113
    O-Ring
    Lead time 5–10 Days
  4. Bolt /1
    AN5-17A.
    Bolt /1
    Lead time 5–10 Days
  5. Cable (Aileron Yoke LH)
    MC1260078-11
    Cable (Aileron Yoke LH)
    Lead time 5–10 Days
  6. Cable (Flap Direct Forward)
    MC0510105-22
    Cable (Flap Direct Forward)
    Lead time 5–10 Days