Chat with us, powered by LiveChat

Control, Cowl Flap, LH

SKU
MC9860058-3
CONTROL, Cowl Flap, LH
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

Product Description
More Information
Weight 0.296649
Manufacturer McFarlane Aviation, Inc
Similar Products
  1. Bolt /1
    AN3-7A.
    Bolt /1
    Lead time 5–10 Days
  2. Cable/Chain Kit
    CCKT180-03S
    Cable/Chain Kit
    Lead time 5–10 Days
  3. Ring (Oil Seal)
    71481
    Ring (Oil Seal)
    Lead time 5–10 Days
  4. High Temp Epoxy, 0.35 Cu. Inch
    20 GLUE KIT
    High Temp Epoxy, 0.35 Cu. Inch
    Lead time 5–10 Days
  5. Cable (Aileron Direct Outboard)
    MC1260505-158
    Cable (Aileron Direct Outboard)
    Lead time 5–10 Days