Chat with us, powered by LiveChat

Control (Carburetor Heat)

SKU
MCS1230-10
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

More Information
Weight 0.157000
Manufacturer McFarlane Aviation, Inc
Similar Products
  1. Cable, Elevator Tab Up
    MCNAS31237-0323
    Cable, Elevator Tab Up
    Lead time 5–10 Days
  2. Grommet /1
    MS35489-11
    Grommet /1
    Lead time 5–10 Days
  3. Gasket
    MS9134-01
    Gasket
    Lead time 5–10 Days
  4. CherryMAX® Blind Rivet /100
    CR3242-4-01
    CherryMAX® Blind Rivet /100
    Lead time 5–10 Days
  5. Bolt /1
    NAS6203-22D
    Bolt /1
    Lead time 5–10 Days
  6. O-Ring
    A1633-49
    O-Ring
    Lead time 5–10 Days