Chat with us, powered by LiveChat

Chain

SKU
MCS2295-25-71
CHAIN
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

Product Description

Use with 2 each MCS2294-25 connecting links.

More Information
Weight 0.065317
Manufacturer McFarlane Aviation, Inc
Similar Products
  1. Control (Throttle)
    MCS1222-6S
    Control (Throttle)
    Lead time 5–10 Days
  2. Tube, Flap Position Indicator
    MC0413416-2
    Tube, Flap Position Indicator
    Lead time 5–10 Days
  3. O-Ring
    MS29513-111
    O-Ring
    Lead time 5–10 Days
  4. O-Ring/10
    MCM83248/1-116
    O-Ring/10
    Lead time 5–10 Days
  5. Fairing, Brake Cover, LH
    26-07-LBC
    Fairing, Brake Cover, LH
    Lead time 5–10 Days