Chat with us, powered by LiveChat

Cable (Elevator Control)

SKU
MC1260505-306
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

More Information
Weight 0.281227
Manufacturer McFarlane Aviation, Inc
Similar Products
  1. Elbow/1 (AN823-6D)
    MS20823-6D
    Elbow/1 (AN823-6D)
    Lead time 5–10 Days
  2. Cable, Stabilator Adjust
    MC41671-9
    Cable, Stabilator Adjust
    Lead time 5–10 Days
  3. Seal Kit, Piper Strut
    PSS-KT-2
    Seal Kit, Piper Strut
    Lead time 5–10 Days
  4. Control, Vernier-Assist, 6'
    MCVA1035-20-072
    Control, Vernier-Assist, 6'
    Lead time 5–10 Days