Chat with us, powered by LiveChat

Bolt, Torque Link, .020 Oversize

SKU
AF2643092-1020
BOLT, Torque Link, .020 Oversi
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

Product Description

Cessna Caravan Torque Link Repair STC

Minimal downtime repair to keep 208/208B nose gears shimmy-free

This STC will dramatically reduce nose gear swaps

  • Save over $15k and be flying the same day
  • Reduce downtime by repairing in the field
  • Convenient tool kit allows for on airplane repair
  • Bolts and pins are cad plated for longer life
  • EASA approved

Tool kits contain short and long piloted reamers and tap handle.

FigurePart NumberDescriptionApproval Type
5REAMERKIT.010REAMERS, Oversized .010 - short & long piloted reamers + tap handleSTC
5REAMERKIT.020REAMERS, Oversized .020 - short & long piloted reamers + tap handleSTC
5REAMERKIT.030REAMERS, Oversized .030 - short & long piloted reamers + tap handleSTC
5REAMERKIT-MASTERREAMERS, all three sizes STC
6AF2643084-1Upper Torque LinkPMA
7AF2643084-2Lower Torque LinkPMA
1AF2643091-1PIN, NominalPMA
1AF2643091-1010PIN, Oversize .010PMA
1AF2643091-1020PIN, Oversize .020PMA
1AF2643091-1030PIN, Oversize .030PMA
2AF2643092-1BOLT, NominalPMA
2AF2643092-1010BOLT, Oversize .010PMA
2AF2643092-1020BOLT, Oversize .020PMA
2AF2643092-1030BOLT, Oversize .030PMA
332-604-37-22005WASHER, .005 thicknessSTC
332-604-37-22010WASHER, .010 thicknessSTC
332-604-37-22015WASHER, .016 thicknessSTC
4AF2643085-200BUSHING, Torque Link PMA
 STC-TORQUE LINKTorque Link STC STC

Installation Tips:

  • Use cutting oil
  • Only drill by hand
More Information
Weight 0.141974
Manufacturer AIRFORMS Inc
Similar Products
  1. Cable (Elevator Up)
    MC1260505-189
    Cable (Elevator Up)
    Lead time 5–10 Days
  2. Dry Air Pump - NEW
    AA442CW4
    Dry Air Pump - NEW
    Lead time 5–10 Days
  3. LED POST LT 14V WHT SHORT BLK
    01-0771434B13
    LED POST LT 14V WHT SHORT BLK
    Lead time 5–10 Days
  4. Landing Light, 28V
    Q4559X
    Landing Light, 28V
    Lead time 5–10 Days
  5. Engine Baffle Kit, Bare, Black Seals
    C207-6975-PKGF-BRBK
    Engine Baffle Kit, Bare, Black Seals
    Lead time 5–10 Days