Chat with us, powered by LiveChat

Bearing, Rod End

SKU
CA452-860A
BEARING, Rod End
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

Product Description

* See the Rod End Eligibility and Application Charts for specific model eligibility.

Rod End Dimensions

Part NumberThreadBore/EyeEligibility*
CA452-334A1/4-28 External0.19"Piper*
CA452-335A1/4-28 Internal RH0.19"Piper*
CA452-336A1/4-28 Internal LH0.19"Piper*
CA452-3681/2-20 Internal0.50"Piper*
CA452-3821/2-20 Internal0.50"Piper*
CA452-4125/16-24 External0.25"Piper*
CA452-439External0.19"Piper*
CA452-860A1/4-28 External0.25"Piper*
GMW-3M-4701/4-28 Internal RH0.19"Non-certified
GMW-4M-470 1/4-28 Internal RH0.25"Non-certified
MC002-381003-51/4-28 External0.25"Beechcraft
MC002-381003-71/4-28 External0.25"Beechcraft
MCMM3M121/4-28 External0.19"Cessna
MCS1104-310-32 Internal0.19"Cessna*
MCS1105-310-32 External0.19"Cessna*
MCS1106-31/4-28 Internal0.19"Cessna*
MCS1106-41/4-28 Internal0.25"Cessna*
MCS1819-41/4-28 Internal0.25"Cessna*
MM-3M-50010-32 External RH0.19"Non-certified
MW-3M-50010-32 Internal RH0.19"Non-certified
S1107-33/8-24 External0.19"Cessna
S1819-31/4-28 Internal RH0.19"Cessna
S1823-33/8-24 External0.19"Cessna
S2022-33/8-24 External RH0.25" Cessna
S2022-3L3/8-24 External LH0.25" Cessna
More Information
Weight 0.050000
Manufacturer McFarlane Aviation, Inc
Similar Products
  1. O-Ring
    AS3209-138
    O-Ring
    Lead time 5–10 Days
  2. Pulley Kit
    PULL-KT-06
    Pulley Kit
    Lead time 5–10 Days
  3. Brake Disc
    APS164-02800
    Brake Disc
    Lead time 5–10 Days
  4. O-Ring /1 - MOQ 10 EA
    MCM83248/1-012
    O-Ring /1 - MOQ 10 EA
    Lead time 5–10 Days
  5. Cable (Rudder Fwd LH)
    MC1260505-15
    Cable (Rudder Fwd LH)
    Lead time 5–10 Days