Chat with us, powered by LiveChat

Bearing, Rod End

SKU
CA452-439
BEARING, Rod End
Lead time 5–10 Days
Add to Wish List

Product images are for illustrative purposes only and may differ in appearance from the actual item delivered.

Product Description

* See the Rod End Eligibility and Application Charts for specific model eligibility.

Rod End Dimensions

Part NumberThreadBore/EyeEligibility*
CA452-334A1/4-28 External0.19"Piper*
CA452-335A1/4-28 Internal RH0.19"Piper*
CA452-336A1/4-28 Internal LH0.19"Piper*
CA452-3681/2-20 Internal0.50"Piper*
CA452-3821/2-20 Internal0.50"Piper*
CA452-4125/16-24 External0.25"Piper*
CA452-439External0.19"Piper*
CA452-860A1/4-28 External0.25"Piper*
GMW-3M-4701/4-28 Internal RH0.19"Non-certified
GMW-4M-470 1/4-28 Internal RH0.25"Non-certified
MC002-381003-51/4-28 External0.25"Beechcraft
MC002-381003-71/4-28 External0.25"Beechcraft
MCMM3M121/4-28 External0.19"Cessna
MCS1104-310-32 Internal0.19"Cessna*
MCS1105-310-32 External0.19"Cessna*
MCS1106-31/4-28 Internal0.19"Cessna*
MCS1106-41/4-28 Internal0.25"Cessna*
MCS1819-41/4-28 Internal0.25"Cessna*
MM-3M-50010-32 External RH0.19"Non-certified
MW-3M-50010-32 Internal RH0.19"Non-certified
S1107-33/8-24 External0.19"Cessna
S1819-31/4-28 Internal RH0.19"Cessna
S1823-33/8-24 External0.19"Cessna
S2022-33/8-24 External RH0.25" Cessna
S2022-3L3/8-24 External LH0.25" Cessna
More Information
Weight 0.060000
Manufacturer McFarlane Aviation, Inc
Similar Products
  1. Cable (Flap)
    MC0510105-194
    Cable (Flap)
    Lead time 5–10 Days
  2. Cable (Rudder Aft LH)
    MC0510105-75
    Cable (Rudder Aft LH)
    Lead time 5–10 Days
  3. Plunger
    HN5P54-1-1
    Plunger
    Lead time 5–10 Days
  4. Bolt /1
    AN24-34A
    Bolt /1
    Lead time 5–10 Days
  5. Engine Baffle Kit, Bare, Orange Seals
    PA28140-64715BROR
    Engine Baffle Kit, Bare, Orange Seals
    Lead time 5–10 Days
  6. O-Ring
    M83248-2-908
    O-Ring
    Lead time 5–10 Days